Electricity / Power in India

Overview
  • India has an installed power generation capacity of 155,000 MW
  • The total demand for power is expected to cross 950,000MWby 2030 
  • The government plans to add about 78,000 MWof installed generation capacity by 2012 
  • Main sources of power in India include thermal power, hydro power and nuclear power 
  • Private sector contributes around 13.5% to total power generation 
  • The per capita power consumption in India is 612 kWh
  • Only 44% of rural households have access to electricity 
  • The Government of India is working towards the objective of ‘Power for All by 2012
Power transmission

  • Transmission of electricity is defined as bulk transfer of power over a long distance at a high voltage, usually 132 kV or more
  • Transmission in the country is divided into five regional transmission system:
Northern region (HQ Delhi): largest in area
Norther eastern region (Shillong) : Highest hydro:thermal power ratio (1:1)
Eastern region (HQ Bangalore)
Southern region (HQ Bangalore)
Western region (HQ : Nagpur)

  • The interconnected transmission system within each region is called the Regional Grid. The eastablishment of a National Grid has been planned
  • Power transmission is handled by the Power Grid Corporation of India Ltd. (PGCIL)
  • Four of the five Regional Grids now operate as a synchronous grid (western, northern, eastern and norther eastern). The Southern Grid is connected to the sysnchronous grid separately through HVDC links.
  • Each Regional Grid functions under a Regional Load Despatch Cenre. Additionally, a National Load Despatch Cenre has been established in New Delhi to coordinate efforts to establish the National Grid
Power distribution

  • Transmission and distribution (T&D) losses in India reach 33%
  • Losses include technical losses such as unplanned lines, overloading, and commercial losses such as theft, pilferage etc
  • The Accelerated Power Development and Reform Programme (APDRP) was initiated in 2001 to bring down T&D Losses below 15%
  • Power distribtion is the responsibility of State Electricity Boards (SEBs)
  • The Maharashtra State Electricity Board (MSEB) is the second largest power generating utility in India, after the National Thermal Power Corporation (NTPC)
GOVERNMENT UNDERTAKING IN POWER SECTOR

NTPC
  • The NTPC is the largest power generating utility in India. Its installed generation capacity is around 30,000MW
  • It was established in 1975 and is headquartered in New Delhi
  • It has 18% of national installed capacity but contributes 28% of national power generation
  • It has 15 coal-based and 7 gas-based power generating plants
  • The largest coal based plant is the Talcher-Kaniha plant in Angul, Orissa (3000 MW)
  • The largest gas based plant is the Dadri plant in Uttar Pradesh (817 MW)
  • The NTPC has forayed into hydro power projects as well. Hydro projects under implementation by the NTPC are
Koldam in Himachal Pradesh (800 MW)
Loharinag Pala in Uttarakhand (600 MW)
Tapovan Vishnugarh in Uttarakhand (520 MW)

National Hydro Power Corporation (NHPC)
  • The NationalHydro Power Corporation Ltd. (NHPC) is a Mini Ratna enterprise responsible for developing hydro power in India
  • It was established in 1975 and is headquartered in Faridabad
  • The NHPC has completed 13 hydro power projects worth installed capacity of 5000 MWand is in the process of implementing 11 more projects
  • The largest hydro plant is the Indira Sagar across the Narmada river in Madhya Pradesh (1000MW)
  • The Subansiri (Lower) project across the Subansiri river in Assam is the largest hydroelectric project undertaken in India. Expected to complete in 2010, it will have an installed capacity of 2000 MW
Nuclear Power Corporaiton of India (NPCIL)
  • The Nuclear Power Corporation of India is responsible for generation of nuclear power in India. The NPCIL is the only power utility company in India that uses nuclear energy
  • The NPCIL was established in 1987 and is headquartered in Mumbai
  • The NPCIL functions under the Department of Atomic Energy (Ministry of Science and Technology)
  • The NPCIL operates 17 nuclear power plants with an installed capcity of 4120MW. Additionally it has five reactors under construction with capaticy of 2660 MW
  • The NPCIL also operates a 10MWwind power project at Kudankulamin Tamil Nadu (site of upcoming nuclear project)
Power Grid Corporation Ltd. (PGCIL)
  • The Power Grid Corporation of India Ltd. is one of the largest power transmission utilities in the world. It was established in 1989 and is headquartered in New Delhi
  • The PGCIL is a Navaratna enterprise
  • The PCCIL conducts about 45% of India’s electricity on its power lines. It has over 71,500 km of transmission network circuitry.
  • The PGCIL operates five Regional Grids (see above). It is also working towards establishing a National Grid in India
Rural Electrification Corporation Ltd (REC)
  • The Rural Electrification Corporation aims to finance and promote rural electrification projects in the country
  • It was established in 1969 and is headquartered in New Delhi
  • The REC provides loans to SEBs and state power utilities for investment in rural electrificaiton schemes
  • The REC is the nodal agency for the implantation of the RGGVY

National Electricity Policy

  • Launched in 2005
  • The objectives of the Policy include
    • Provide access to electricity to all housholds by 2010
    • Power demand to be fully met by 2012. Energy and peaking shortages to be overcome
    • Supply of reliable and quality power at affordable rates
    • Minimum lifeline consumption of 1 unit per houshold per day by 2012
    • Per capita availability of electricity to be increased to over 1000 units by 2012
    • Financial turaround and commercial viability of electricity sector
    • Protection of consumer’s interests
  • The Policy also required the Central Electricity Authority (CEA) to frame a National Electricity Plan every five years, which covered
  • The Policy seeks to address multiple issues including the following
    • Rural electrification
    • Power generation, transmission and distribution
    • Recovery of cost and subsidies
    • Technology development and R&D
    • Power sector reforms including private sector participation
    • Energy conservation
    • Renewable energy sources
  • In order to implemtn the policy, the RGGVY scheme was launched by the Rural Electrification Corporation

Rural Electrification Policy

  • Launched in 2006
  • Objectives include
    • Provision of access to electricity to all housholds by 2009
    • Quality and realible power supply at reasobable rates
    • Minimumhousehold consumption of 1 unit per household per day by 2012
  • As per the policy, all state government were required to prepare and notify a Rural Electrification
    Plan to achieve the Policy goals

Rajiv Gandhi Grameen Vidyutikaran Yojana (RGGVY)

  • Thr RGGVY was launched in 2005 to implement the National Electricity Policy
  • The RGGVY is implemented by the REC
  • The RGGVY provides 90% Union Government subsidy for rural electrification projects including
    • Rural Electricy Distribution Backbone (REDB): The REDB is to act as the primary infrastructure for the distribution of electricity in rural areas. Each Block to have at least one 33/11 kV substation
    • Village Electrification Infrastructure (VEI): at least one distribution transformer in each village
    • Decentralised Distributed Generation (DDG) System: these systems are to act as stand-alone power generation and distribution mechanismwhere supply from the grtid is not possible or not cost-effective
  • The RGGVY provides for free connection to all households below the poverty line
  • The Scheme says that there shall be no discrimination in the hours of supply between urban and rural areas. This should help in development of rural industries, health care and education facilities
  • The Scheme targets the electrification of 125,000 un-electrified villages 

sourced from here

    Thursday, January 5, 2012

    National mission on monsoon prediction soon

    • The Union Cabinet is likely to give its final approval for a national mission to try and improve the accuracy of monsoon forecasts by this month-end.
    • The mission, estimated to cost Rs. 350 crore, is designed to improve the current generation of dynamic numerical models for prediction through better insight of the highly complex phenomenon of monsoon.
    • Under the project, scientists would work on models from the United Kingdom's Met Office and the United States' National Centers for Environment Prediction . 
    • The mission would have two components relating to two different timescales — monthly, seasonal and intra-seasonal scale on the one hand and a medium range forecast, up to 15 days, on the other.
    • At present, India Meteorological Department makes its forecasts based on the system of a statistical model, which makes the prediction on the basis of several predictors. 
    • India does not have a dynamic numerical model of it own. The goal now is to develop a model that would be India-specific within five years

    Saturday, December 31, 2011

    Cyclone Thane has made landfall on the southern Indian coast

    Sea condition is very high along and off north Tamil Nadu, Puducherry and adjoining south Andhra Pradesh coasts.

    Winds of 140km/h (86mph) have damaged houses and uprooted trees and electricity poles.

    The cyclone made landfall on the coast between Cuddalore in Tamil Nadu state and the union territory of Pondicherry early on December 30.

    Meaning Of Thane:

    A freeman granted land by the king in return for military service in Anglo-Saxon England.
    A man ranking above an ordinary freeman and below a nobleman in Anglo-Saxon England.

    Friday, August 19, 2011

    West Bengal to be renamed Paschimbanga

    • A consensus to rename West Bengal as Paschimbanga was on Friday reached at an all-party meeting to change the nomenclature of the state.
    • The choice was made from among the suggestions of 'Paschimbanga', 'Bangla' and 'Bangabhumi'
    • Once the bill in this regard is passed by two-thirds majority in both Lok Sabha and Rajya Sabha and ratified by the President, the state would get the new name.
    • In the past also, similar moves were taken to rename West Bengal -- once in 1974 during Congress rule and later in 1999 when Left Front was in power. The moves did not mature due to various reasons

    Thursday, August 18, 2011

    Special Status to Bio-Sphere Reserves

    Seventeen sites have been designated as biosphere reserves in the country so far. The details  are given in the table below:

     
    S.
    No
    Name of the  designated Biosphere Reserve
    Location of the Biosphere Reserve.
    1
    Nilgiri
    Wynad, Nagarhole, Bandipur and Madumalai, Nilambur, Silent Valley and Siruvani hills in Tamil Nadu, Kerala and Karnataka States.
    2
    Gulf of Mannar
         
    Lies along the South-Eastern coast of India and extending from Rameswaram island in the North to Kanyakumari in the South  (Tamil Nadu).
    3
    Sunderbans

    Parts of delta of Ganges & Brahamaputra river system in West Bengal.
    4
    Nanda Devi 
    Chamoli, Pithoragarh and Almora districts in Uttarakhand.    
    5
    Pachmarhi
    Betul, Hoshangabad and Chhindwara districts in Madhya Pradesh.
    6
    Nokrek
    East, West and South Garo Hill districts in Meghalaya. 
    7
    Simlipal
    Mayurbhanj district in Orissa.
    8
    Agasthyamalai

    Thirunelveli and Kanyakumari districts in Tamil Nadu and Thiruvanthapuram, Kollam and Pathanamthitta districts in Kerala.
    9
    Great Nicobar
    Southernmost island of Andaman and Nicobar Islands.
    10
    Achanakmar- Amarkantak
    Anuppur and Dindori districts of Madhya Pradesh and Bilaspur district of Chattisgarh.
    11
    Khangchendzonga
    North and West districts in Sikkim.
    12
    Manas

    Kokrajhar, Bongaigaon, Barpeta, Nalbari, Kamprup and Darang districts in Assam.
    13
    Dibru-Saikhova
    Dibrugarh and Tinsukia districts in Assam.  
    14
    Dehang-Dibang 
    Upper Siang, West Siang and Dibang Valley districts in Arunachal Pradesh. 
    15
    Kachchh
    Kachchh, Rajkot, Surendranagar and Patan districts in Gujarat.
    16
    Cold Desert
    Pin Valley National Park and surroundings;   Chandratal & Sarchu; and Kibber Wildlife  Sanctuary in Himachal Pradesh.  
    17
    Seshachalam
    Parts of Seshachalam hill ranges in Eastern Ghats encompassing parts of civil districts of Chittoor and Kadapa in Andhra Pradesh.

    Friday, May 20, 2011

    Ports in India

    The classification of Indian ports into major, minor and intermediate has an administrative significance. Indian government has a federal structure, and according to its constitution, maritime transport falls under the "concurrent list", to be administered by both the Central and the State governments. While the Central Shipping Ministry administer the major ports, the minor and intermediate ports are administered by the relevant departments or ministries in the nine coastal states—West Bengal, Orissa, Andhra Pradesh, Tamil Nadu, Kerala,Karnataka, Goa, Maharashtra and Gujarat. Several of these 185 minor and intermediate ports are merely "notified"; little or no cargo handling actually takes place. These ports have been identified by the respective governments to be developed, in a phased manner, a good proportion of them involving public–private partnership.

    Major ports as below

    PORTS                       Location
    KOLKATA              Bengal
    PARADIP              Orissa
    VISAKHAPATNAM   Andhra Pradesh
    ENNORE              TamilNadu
    CHENNAI              TamilNadu
    TUTICORIN              TamilNadu
    COCHIN                     Kerala
    NEW
    MANGALORE           Karnataka
    MORMUGAO             Goa
    MUMBAI             Maharashtra
    JNPT
    (Jawahar Lal Nehru Port Trust)   Maharashtra
    KANDLA            Gujrat
    Port Blair                   Andaman Nicobar